10.12 Award of Contract for Pre-Construction Services for the Granada High School Varsity Softball Field Rehabilitation Project  
:
 
Attachment Summary:
 
File Attachment:
Bothman Precon Services Agreement - GHS Softball Fields.pdf
 
Quick Summary / Abstract:
Staff is requesting Board of Trustees’ approval of pre-construction services for the Granada High School Varsity Softball Field Rehabilitation Project.  
Background:
Our Board of Trustees (Board) approved a pool of contractors qualified to provide Lease-Leaseback (LLB) construction services at the October 4, 2022 Board meeting. The pool of Board approved contractors was reviewed, and Robert A. Bothman Inc. was selected as the firm most suited for this specialized scope of work. A mandatory pre-proposal job walk was conducted on August 15, 2023. Pre-construction services allow staff to maximize the benefits of the LLB process including the expertise of the general contractor early in the design development process. Contractor expertise in constructability, logistics and cost control/budgeting are key elements that can significantly benefit the design, implementation, and budget of the Project.  
Status:
A proposal from Robert A. Bothman Inc. was received on August 24, 2023, and evaluated by staff based on Board approved evaluation criteria identified in the request for proposal (RFP), including price, design/value engineering approach, project methods, approach to strategic plan to complete the Project, schedule/delivery date, and responsiveness to the RFP. Prior to finalization of the guaranteed maximum price (GMP), and prior to Board award of the construction contract, the District will have access to verifiable information regarding all cost including sub-contractor bids, value engineering back-up, contingency breakdown and tracking documents, general conditions breakdown and tracking documents, and contractor fees. The GMP contract attachments will be provided at the time of the recommended contract approval. All documents were prepared by legal counsel.  
Fiscal Impact:
The recommended contacted amount is fifty-six thousand one hundred dollars and 00/100 cents ($56,100.00) This is a Measure J funded project.  
Superintendent's Recommendation
The Superintendent's recommendation is that our Board of Trustees award the Contract for Pre-Construction Services for the Granada High School Varsity Softball Field Rehabilitation Project.  
Approvals:
Recommended By:
Signed By:
Kim McNeely - Bond Program Director
Signed By:  
Chris Van Schaack - Superintendent
 
Vote Results:

Original Motion
Member Emily Prusso Moved, Member Steven Drouin seconded to approve the Original motion 'The Superintendent's recommendation is that our Board of Trustees award the Contract for Pre-Construction Services for the Granada High School Varsity Softball Field Rehabilitation Project.'. Upon a Roll-Call Vote being taken, the vote was: Aye: 5 Nay: 0.
The motion Carried 5 - 0
   
Craig Bueno     Yes
Emily Prusso     Yes
Kristie Wang     Yes
Yanira Guzman     Yes
Steven Drouin     Yes